The Tauern rail line is closed between Schwarzach-St. Veit and Mallnitz-Obervellach from 8 February to 9 July 2027, according to ÖBB. Replacement buses run from Bischofshofen to Spittal-Millstättersee during the closure, the car shuttle train is suspended, and the A10 motorway has no closure announced for that period.
Checked on against the official sources cited (ÖBB, ASFINAG, oesterreich.gv.at, ÖAMTC).
From 8 February to 9 July 2027, there is no train between Salzburg and Carinthia. ÖBB is closing the Tauern rail tunnel section for the second phase of its renovation. In the same window, a Deutsche Bahn project cuts the line between Rosenheim and Freilassing, at the Deutsches Eck, on the route to Salzburg from Munich. If you plan to reach Carinthia by train or by bike, you need to rethink your route. By car, the A10 motorway has no closure announced for this window.
Every price, timetable and rule comes with its source and the date we checked it. When two sources disagree, we say so rather than picking one. The reopening date, 10 July 2027, is announced by ÖBB, but it isn’t firm yet.
1. What closes, and what stays open

The closed section
According to the ÖBB construction page, the closure covers the section between Schwarzach-St. Veit, in the Salzburg Pongau, and Mallnitz-Obervellach, on the Carinthian side. The Tauern rail tunnel sits at the heart of this section. It is described as closed between Böckstein and Mallnitz, which makes it part of the same works rather than a second project. salzburg24.at gives a length of 8,371 metres for the tunnel, a figure we quote with that attribution. ÖBB construction page (checked 19 November 2026).
What’s suspended
- Trains between Schwarzach-St. Veit and Mallnitz-Obervellach, tunnel included.
- The Autoschleuse Tauernbahn, the train that carries cars between Böckstein and Mallnitz, suspended for the whole length of the works.
- Rail freight, diverted on a large scale, and some night train links. ÖBB doesn’t run Stuttgart – Venice during the closure.
What stays open
- The A10 motorway (Tauern). No closure is announced for this window. That’s an absence of announced restrictions, not a guarantee.
- Main-line trains between Mallnitz-Obervellach and Spittal-Millstättersee, every two hours according to ÖBB.
- The Tarvisio – Villach line on the Italian side, which the Mallnitz tunnel closure doesn’t touch.
Only the train is cut. The A10 motorway has no closure announced for this window, and the rail link between Mallnitz-Obervellach and Spittal-Millstättersee stays in service. Preparatory works on the Mallnitz tunnels start in autumn 2026, with no restriction for travellers. The closure itself lasts five months, less than the previous one. In 2024-2025 the line was closed for eight months according to one salzburg24.at article, and nine months according to another from the same paper. We go with eight months and flag it, because sources vary on the length.
Three works overlap in the same region, and most of the mistakes in guides come from confusing them. The table below separates them by date and by operator.
| Date | Event | Status | Operator |
|---|---|---|---|
| Autumn 2026 | Rail preparatory works, no restriction for travellers | Confirmed | ÖBB |
| 13 December 2026 | 2027 timetable comes into force | Announced | ÖBB |
| 8 February 2027 | Tauern tunnel closure begins | Confirmed | ÖBB |
| 8 February 2027 | Start of the Deutsches Eck works (Freilassing – Rosenheim) | Disputed (8 February per ÖBB, evening of 7 February per a secondary source) | Deutsche Bahn, per ÖBB |
| 19 March 2027 | Bike shuttle starts between Bad Gastein and Mallnitz-Obervellach | Announced | ÖBB |
| 9 July 2027 | Rail closure ends | Confirmed | ÖBB |
| 10 July 2027 | Trains and Autoschleuse resume | Announced, not yet firm | ÖBB |
| End of September 2027 | Start of A10 road works (Tauern and Katschberg) | Confirmed | ASFINAG |
Source: ÖBB, construction page and ASFINAG, A10 project, checked 19 November 2026.
2. Getting to Carinthia from Salzburg

The most direct train journey is the one that’s cut. From Salzburg, ÖBB runs a chain of replacement buses and trains instead. Three legs matter, and each one has its own level of certainty.
The long-distance bus Bischofshofen – Spittal-Millstättersee
This is the backbone of the set-up. A bus leaves Bischofshofen for Spittal-Millstättersee every hour, with no stops in between, according to ÖBB and the press reports checked on 19 November 2026. Bischofshofen is on the Salzburg – Villach line, so you get off the train there to catch the bus. At Spittal-Millstättersee a train carries on to Villach. ÖBB also announces a few direct departures to Villach at fixed times. We don’t reproduce them: the ÖBB page, read by automatic extraction, didn’t let us reconfirm them. Check the page when you book.
For tickets, ask the operator whether your ticket is valid on the replacement bus. There is no single published fare for the Salzburg – bus – Villach trip.
The Gastein valley bus and the shuttle
For Bad Gastein, a replacement bus runs every hour between Schwarzach-St. Veit and the valley, stopping at Dorfgastein, Bad Hofgastein and Bad Gastein station. ÖBB also announces a « pendulum » shuttle between Bad Gastein and Mallnitz-Obervellach, with stops at Obervellach, Spittal-Millstättersee, St. Johann im Pongau and Schwarzach-St. Veit. No frequency has been published yet. Commuters should wait for the 2027 publication before planning their trips.
Carinthian side: trains and connections
Between Mallnitz-Obervellach and Spittal-Millstättersee, main-line trains run every two hours. Between Spittal and Villach, timetable adjustments are possible. The S4 between Klagenfurt and Villach loses some stops, though the full list isn’t published in the pages we read. The state of Carinthia promotes the « ÖBB Transfer Kärnten » scheme: 19 stations served and around 6,000 accommodations, with online booking to do before you travel, according to Kärnten.at (checked 19 November 2026).
Westbahn: the southern line to Villach
Since 1 March 2026, Westbahn runs a Vienna – Graz – Klagenfurt – Villach service. It doesn’t go through the Tauern and doesn’t offer a direct Salzburg – Villach link. We don’t quote the number of daily trains because the sources disagree: check westbahn.at before you book.
The table below sums up the routes by starting point. The « Status » column tells you whether the information comes from a published official document, or whether it is still an announcement or a plan.
| Departure | Route | Mode | Status |
|---|---|---|---|
| Salzburg | Bus Bischofshofen – Spittal-Millstättersee, every hour, then train to Villach | Bus then train | Bus confirmed, timetable announced |
| Bad Gastein | Bus Schwarzach-St. Veit – Bad Gastein, every hour | Bus | Confirmed |
| Munich | Train to Salzburg via Mühldorf, then the route above | Train then bus | Planning announced by ÖBB, duration disputed (up to 120 min per one source), check with ÖBB |
| France or Germany | Road via the A8, then the A10 Tauern | Car | Road open, no closure announced |
| Italy (Milan, Udine) | Road via the A23, then Tarvisio and Villach, or train Tarvisio – Villach | Car or train | Toll disputed, train not affected |
| Vienna or Graz | Westbahn Vienna – Graz – Klagenfurt – Villach; or Koralmbahn train Graz – Klagenfurt (41 minutes at the fastest), then Villach | Train | Westbahn running since 1 March 2026, frequency to check on westbahn.at; Koralmbahn announced |
Source: ÖBB, construction page, ASFINAG, Westbahn press release of 1 March 2026, checked 19 November 2026.
3. From France, Germany, Switzerland and Italy
Your starting point changes almost everything. The trip from France and Germany is hit by the Deutsche Bahn works, while the trip from Italy mostly goes by road and by the southern rail line, which is less affected. The sub-sections below follow that logic.
From France
The simplest route goes through Germany, then Salzburg. Between Munich and Salzburg, the Freilassing – Rosenheim (Deutsches Eck) works take the same window, from 8 February to 9 July 2027, according to ÖBB. Their start date is disputed: one secondary source points to the evening of 7 February. We go with 8 February, the date ÖBB publishes. The Munich – Salzburg trip is in planning, announced by ÖBB, and its duration is disputed (up to 120 min per one source), so check with ÖBB. By car, the A10 has no closure announced, see section 4.
From Germany
You have two options. The first is the road: the A8 to Salzburg, then the A10 Tauern. No rail works touch it, but you’ll need the vignette and the Streckenmaut. The second combines the Munich – Salzburg train, which takes the detours ÖBB has announced via Passau and Mühldorf, then the replacement bus to Spittal-Millstättersee. In that case the Munich – Salzburg trip is in planning, with a disputed duration (up to 120 min per one source), so check with ÖBB. Build your schedule from the timetables published closer to your trip, as not all of them are final yet.
From Switzerland
The rail trip via Munich hits both works, but the extra journey times published by sources don’t agree, whether for Zurich via Bischofshofen or for links via St. Gallen. So we don’t publish any duration. Check the ÖBB or SBB timetable when you book, and allow some slack.
From Italy
By road, the A23 motorway links Palmanova to Tarvisio. The toll is closed and paid at the exit. Class A (cars) costs between €8 and €10 depending on the source, so check before you go. Details in section 4. By rail, the Tarvisio – Villach line isn’t touched by the Mallnitz tunnel closure. However, the Italy – Austria night trains are diverted, and ÖBB doesn’t run Stuttgart – Venice. No official Milan – Villach timetable for 2026 or 2027 has been found. Aggregators disagree, especially on night trains, so we don’t publish a timetable.
From Salzburg
By car, the A10 Tauern is still the direct road route, with the vignette and the Streckenmaut to pay. By train, you have to change at Bischofshofen, then take the ÖBB bus to Spittal-Millstättersee. If you’re coming from Munich or Vienna, expect detours too: for Vienna – Munich, ÖBB announces a route via Passau, with 30 to 45 minutes added depending on the planning.
4. By car: vignette, Streckenmaut and the A10 motorway
Three costs stack up for a car taking the A10 to the Tauern road tunnel. They don’t all have the same validity dates, and that’s where the amounts get confusing. For a trip during the rail closure, the vignette to buy is the 2027 one.
The 2027 vignette, and the 2026 one
The 2027 vignette is required to drive on Austrian motorways. It costs €108.90 according to the ÖAMTC, a figure the ASFINAG hasn’t confirmed yet. It is digital only and valid until 31 January 2028. For the details on the e-vignette, see our article on the Austria vignette 2027.
According to oesterreich.gv.at, whose last update is dated 1 January 2026, the 2026 sticker vignette costs €106.80. Its expiry date is disputed: 31 January 2027 per one source, 1 February 2027 per another. Check the date on asfinag.at before you set off.
The Streckenmaut for the Tauern tunnel
The road tunnel has its own charge, the Streckenmaut, on top of the vignette. The principle is confirmed by traveltips.at, page updated 10 November 2026, and by the German motoring press. For a car, the amount is about €15, according to auto motor und sport and traveltips.at. The official rate still needs checking on oesterreich.gv.at.
The Italian A23 toll
On the A23, between Palmanova and Tarvisio, class A (cars) costs between €8 and €10 depending on the source, so check before you pass. The system is closed: you pay at the exit, and the Telepass badge goes through automatically on the lanes marked for it. The Telepass page has no update date, which is why we’re cautious about the amount.
The A10 during and after the closure
ASFINAG doesn’t flag any closure of the A10 from February to July 2027. The renovation works on the Tauern and Katschberg road tunnels start at the end of September 2027, with completion planned for June 2033. During the works, one tube is closed and one lane per direction runs through the other. A summer break is planned from early July to early September, and the first peak-traffic days are announced for spring 2028. Mechanical barriers are planned at the Flachau and Rennweg junctions, to limit traffic spilling onto regional roads.
| Item | Amount | Validity | Status | Source |
|---|---|---|---|---|
| Annual car vignette 2027 | €108.90 | 1 December 2026 to 31 January 2028, digital only | Announced, needed for the closure | ÖAMTC |
| Annual car vignette 2026 | €106.80 | Expiry disputed: 31 January 2027 or 1 February 2027 | Amount confirmed, expiry date disputed | oesterreich.gv.at |
| Tauern tunnel Streckenmaut | About €15 | Per crossing | Principle confirmed, amount disputed | traveltips.at, auto motor und sport |
| A23 toll, class A (Palmanova – Tarvisio) | Between €8 and €10 depending on source | No update date given | Disputed | Telepass |
Source: oesterreich.gv.at, ÖAMTC, Telepass, checked 19 November 2026.
What other guides don’t tell you
The guides we read cover the closure, the buses and the vignette. They leave out five points, checked as of 19 November 2026.
- The German works hit the train, not the road. ÖBB publishes the Freilassing – Rosenheim closure for the same window, with detours announced via Passau and Mühldorf. It affects Munich – Salzburg trains, not the A8 or the A10. ÖBB, Deutsche Bahn works 2027 (checked 19 November 2026).
- The A10 works have a summer break, and peak days from 2028. ASFINAG pauses the works from early July to early September and announces the first peak days for spring 2028. ASFINAG, A10 project (checked 19 November 2026).
- Mechanical barriers are planned at Flachau and Rennweg, and transit bans on the passes are being harmonised. The text doesn’t say which vehicle categories are affected. It’s an announced measure, to be confirmed as the works approach. ASFINAG, A10 project (checked 19 November 2026).
- The 2027 vignette will only be sold digitally. The change is announced by ÖAMTC, and the official price hasn’t been checked. ÖAMTC, 2027 vignette (checked 19 November 2026).
- The bike shuttle runs on demand, with no fixed timetable published. The guides give the price without how it works or how to pay, and sometimes mention a booking that isn’t confirmed. ÖBB, construction page (checked 19 November 2026).
Practical info before you go
The 2027 timetable takes effect on 13 December 2026, according to ÖBB, and tickets have been on sale since 14 October 2026. Not every line is fully planned yet, so check the timetable before you book a trip that crosses the closure.
The state of Carinthia promotes the ÖBB Transfer Kärnten scheme: 19 stations served and around 6,000 accommodations. Booking is online, before you travel. Hosts were asked to tell their guests early and to offer staggered arrivals.
Several dates are announced but not yet firm: the 10 July 2027 resumption, the bus timetables, the bike shuttle. Check the ÖBB construction page and the ASFINAG site for tolls on the day of your trip. If your stay starts in Austria before the closure, our guide to Austrian ski opening dates 2026-2027 helps you line up the dates.
Frequently asked questions about the Tauern closure
When is the Tauern line closed in 2027?
The Schwarzach-St. Veit – Mallnitz-Obervellach section is closed from 8 February to 9 July 2027, according to the ÖBB construction page. The Tauern rail tunnel is part of this closure. ÖBB announces trains and the Autoschleuse resuming on 10 July 2027, though this isn’t firm yet. Preparatory works start in autumn 2026, with no restriction for travellers.
Does the car shuttle train (Autoschleuse) run during the closure?
No. ÖBB announces the Autoschleuse Tauernbahn is suspended for the whole works period, from 8 February to 9 July 2027. Resumption is announced for 10 July 2027, not yet firm. To cross the Tauern by car in this period, take the A10 motorway, which has no closure announced for this window, with the vignette and the Streckenmaut.
How do I get from Salzburg to Villach during the closure?
Take the train to Bischofshofen, then the ÖBB replacement bus, which runs every hour to Spittal-Millstättersee with no stops in between. A main-line train then continues to Villach. ÖBB also announces direct departures to Villach at fixed times, which we weren’t able to reconfirm. Ask the operator whether your ticket is valid on the replacement bus: there is no single published fare for this trip. The full journey time isn’t published, so check the timetable when you book.
Can I take my bike during the closure?
A bike shuttle runs from 19 March to 9 July 2027 between Bad Gastein and Mallnitz-Obervellach, on demand. It costs €10 per trip and per direction, paid in cash to the driver. Booking rules aren’t published yet. For bikes on the replacement buses, the ÖBB page contradicts itself: ask ÖBB before you travel.
Do I need a vignette for the A10 in 2027?
Yes, a car needs the 2027 vignette on Austrian motorways. It costs €108.90 according to the ÖAMTC (announced amount), it is digital only and valid until 31 January 2028. The 2026 sticker vignette costs €106.80, but its expiry date is disputed: 31 January 2027 per one source, 1 February 2027 per another. Check the date on the ASFINAG site before you leave.
Do I have to pay a Streckenmaut on top for the Tauern tunnel?
Yes. The Tauern road tunnel has a Streckenmaut on top of the vignette. For a car, it’s about €15, according to the sources we checked. We didn’t check the official rate on the administration’s site, so don’t treat the figure as final before you go.
Is the A10 closed or disrupted during the rail closure?
No closure of the A10 is announced for February to July 2027. ASFINAG puts the start of the Tauern and Katschberg tunnel renovation at the end of September 2027, with completion planned for June 2033. The works therefore follow the rail closure, not the other way round. A summer break is planned from early July to early September.
Do night trains run during the closure?
Some links are diverted. ÖBB says the Stuttgart – Venice link isn’t offered during the closure. International night links aren’t all confirmed for 2027, and we don’t name any. For a night train, check with the operator when you book.
Does the German works also affect Munich – Salzburg?
Yes, for the train. The Freilassing – Rosenheim (Deutsches Eck) section is closed over the same window, from 8 February to 9 July 2027, according to ÖBB. Its start date is disputed: one source points to the evening of 7 February, but we go with the ÖBB date. The Munich – Salzburg trip is in planning, announced by ÖBB, and its duration is disputed (up to 120 min per one source), so check with ÖBB. The announced detours go via Passau and Mühldorf. The A8 and the A10 aren’t affected by this rail work.
Is Milan – Villach possible by train?
The Tarvisio – Villach line isn’t affected by the Tauern tunnel closure. However, no official 2026-2027 timetable has been found for Milan – Villach, and aggregators disagree, especially on night trains. So we don’t publish a timetable. Check with the operator before you book, and allow some slack if you have a connection at Udine or Tarvisio.
Sources and dates checked
- ÖBB, Tauern closure construction page : dates, buses, bike shuttle, night trains, freight (checked 19 November 2026).
- ÖBB press, second stage in the Tauern tunnel : closure dates (checked 19 November 2026).
- ÖBB, Deutsche Bahn works 2027 : Freilassing – Rosenheim and detours (checked 19 November 2026).
- ÖBB, 2027 timetable : entry into force and sales (checked 19 November 2026).
- ÖBB, Autoschleuse Tauernbahn : published prices, undated (checked 19 November 2026).
- ASFINAG, renovation of the Tauern and Katschberg tunnels : A10 works schedule (checked 19 November 2026).
- oesterreich.gv.at, vignette for vehicles up to 3.5 t : 2026 rate (checked 19 November 2026).
- ÖAMTC, switch to digital vignettes in 2027 : announced amount and validity (checked 19 November 2026).
- Telepass, A23 Palmanova – Tarvisio motorway : rates by class, no update date (checked 19 November 2026).
- Kärnten.at, Tauern tunnel closure : ÖBB Transfer Kärnten, accommodation (checked 19 November 2026).
- Westbahn, press release of 1 March 2026 : Vienna – Graz – Klagenfurt – Villach service (checked 19 November 2026).
- salzburg24.at, article of 27 April 2026 : regional press, tunnel length, context (checked 19 November 2026).
- traveltips.at, Tauernbahn closure 2027 : Streckenmaut, bike shuttle (page updated 10 November 2026, checked 19 November 2026).
- auto motor und sport, Streckenmaut 2026 : Streckenmaut rate for a car (checked 19 November 2026).
Sources were checked on 19 November 2026. Rates and timetables can change: check them on the operator’s or the administration’s site before you travel.

Plan your trip with Pixidia
Pixidia learns how you travel and helps you build a trip that truly fits you and everyone coming along.
Open the planner
